Corporate
What's new
P&O and QR join forces to create Western Sydney Intermodal Hub

P&O Trans Australia – the Kaplan/DP World joint venture – and QR today announced a logistics partnership resulting in the creation of a combine...
More»

QR signs up team to deliver Goonyella to Abbot Point Expansion Project

A $1 billion expansion of the export coal rail network – the biggest rail project in Queensland in three decades – came a step closer today with th...
More»


Resource conservation & waste reduction

Case study


Alternative Sleeper Sourcing Project  

QR is pursuing alternative sleeper technologies with an emphasis on composite type sleepers. There are over 9 million timber sleepers on the QR network and in 2003/2004 QR expects to use approximately 280,000 hardwood sleepers during maintenance. Over the life cycle of the sleeper, significant environmental gains can be made by introducing sleepers other than the traditional hardwood type. Specifically, the following beneficial environmental outcomes are expected:

  • Use of recycled waste materials to manufacture the sleepers;
  • Ability to recycle the sleepers at the end of their service life;
  • Elimination of the use of preservatives/insecticides/termiticides;
  • Conservation of valuable timber resources; and
  • Reduction of greenhouse gas generation due to the expected increased life cycles for ‘composite sleepers’.    

The current status of sleeper development ranges from full production in the US for their local markets through to those suppliers that are still developing prototypes/potential materials. The following provides a summary of the progress with the development of alternative sleeper technologies: 

  • 500 trial prestressed concrete sleepers based on actual in-track performance data.
  • A small quantity (12) of sleepers made from recycled products in track under trial.
  • The production of two fibre composite prototype sleepers.    


graphic Need some assistance? Contact Us
Corporate
13 16 17

Emergency notices
22/08/2008 1:15:24 PM

PEAK TIME RESULTS

Thursday 21/08/08 Trains on time 190 of ...

 Quick Find...

QR Annual Report
Download QR's 2005/2006 Annual Report (pdf)


  line
Email Email a friend Print Print this page Back to Top Back to top

 
Copyright | Disclaimer | Privacy Statement | Linking to our site | Site Map

QR Limited is a government owned corporation of the State of Queensland. ACN 124 649 967 ABN 47 564 947 264
13 16 17
spacer